Change order of apps on app pages

  • Thread starter Thread starter AC Question
  • Start date Start date
A

AC Question

On the app page that contains all of the apps, there are many pages that are not full because I deleted some of the apps. I like that the first page is the preloaded set of apps (t-mobile and google for instance) but I want to combine the apps so that the screens are full. I do not need them in alphabetical order and I do not want to change the first page (by the view by date). Is there a way to move some of the apps?
 
:cool: 1st-Step: Open the screen to transfer the app. Tap to open the
Apps drawer aka=Default apps located in HomeScreen lower
row-Last icon with tiny squares or cicles

2nd-Step: Tap the word -EDIT- The icons able to move get a circle
with red bar across - So tap the desired app to move and
drag it or force against the HomeScreen-edge: Later
get back to the AppsDrawer and Tap on -DONE-

Same way to transfer apps to other screens. If need
more Info..open an account in ACentral.com
 

Members online

Forum statistics

Threads
963,279
Messages
6,992,990
Members
3,164,999
Latest member
Pickle240